All You Need
In One Single
Theme.
Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat
Search here:

Our supply

Back

Logistics Platform Montélimar

To be develop
30,000 sq.m – Montélimar (26)

Availability : 12 months after reaching an agreement

Autorization to operate: 1510, 1511, 2662, 2663, 1530, 2920, 2925, 4320, 4330

The building:

  • Land of 70,000 sq.m
  • 5 storage cells – 29,000 sq.m
  • Offices: 450 sq.m
  • Technical spaces: 500 sq.m
  • 120 car parks for light vehicules including 3 for person with reduced mobility
  • 220 car parks or 20 for trucks

Functionalities:

  • Yard truck 35 meters
  • Access for light vehicules & trucks separated
  • Autodocks
  • Possibility of positive cold 2-4°C / 8°C
  • Level access ramps
  • Concrete structure
  • Free height under beam: 11 m
  • Full LED lighting
  • Qualitative facades in pre-lacquered steel and glazed strip
  • Reinforced thermal insulation
  • Paving implemented according to DTU 13.3, 5T/m²
  • Heating by hot water unit heaters, city gas energy
  • Sprinkler
  • Firewalls
Category:

Interested in this project? Contact us!

Description

Montélimar (26)
30,000 sq.m to build

Additional information

Date de disponibilité

< 18 mois

Région

AUVERGNE RHONE ALPES

Surface

10 000 m² – 20 000 m², 20 000 m² – 40 000 m²